Estimating for Builders and SurveyorsRoutledge, 16 mei 2012 - 320 pagina's Written for students taking courses in building and surveying, 'Estimating for Builders and Surveyors' describes and explains the method used by the estimator to build up prices or rates for items described in the SMM7 format. Each chapter is a self-contained unit related to a particular element in the building. Worked examples throughout reflect both traditional and up-to-date technology. Written by an author team of academics and professional surveyors, this book continues to be an invaluable introduction to the subject of estimating. |
Inhoudsopgave
1 | |
2 The cost of labour | 16 |
3 Mechanical plant | 44 |
4 Preliminaries | 58 |
5 Excavation and filling | 73 |
6 Concrete work | 104 |
7 Brickwork and blockwork | 123 |
8 Underpinning | 133 |
14 Plumbing installations | 191 |
15 Linings partitions and surface finishes | 225 |
16 Glazing | 243 |
17 Decorative papers and painting | 249 |
18 Drainage | 257 |
19 Electrical work | 266 |
20 Analogous rates | 271 |
21 Information technology | 281 |
Overige edities - Alles bekijken
Estimating for Builders and Surveyors R D Buchan,Eric Fleming,Fiona Grant Gedeeltelijke weergave - 2012 |
Estimating for Builders and Surveyors R. D. Buchan,Eric Fleming,Fiona E. K. Grant Gedeeltelijke weergave - 2003 |
Estimating for Builders and Surveyors R. D. Buchan,Eric Fleming,Fiona Grant Geen voorbeeld beschikbaar - 2016 |
Veelvoorkomende woorden en zinsdelen
additional aggregate allowance amount assumed basic bill of quantities bricks building calculation carried cement cent centres chapter client coat concrete construction contract contractor cost cover depth disposal Divide employer estimator Example excavation exceeding facing factors Figure finish fittings fixing given gives glass gross ground hand hire holidays hourly included increase joints Labour length machine manufactured Material cost Materials measured method metre mixer mortar nails normally oncost 20 operative outputs paid payment percentage period pipe plant plumber productive Profit and oncost purchase range Rate per metre rules screwed sheet slates SMM7 squad stage standard steel surface Table tender thick tiles timber tonne total cost tradesmen trench unit volume wage wall Wastage Waste week wide width